Australia added 680 MW/mo of new solar capacity in the most recent trailing 12 months, and over 90% of the modules landed at Melbourne were manufactured in China. This is the operational sourcing guide our desk uses with buyers active in Australia — covering supplier vetting, CIS + LGCs compliance, AUD pricing dynamics, container-load economics and delivery timelines from Chinese factory gate to your site.
New capacity (TTM)
680 MW/mo
Australia
China module share
90%+
@ Melbourne
Typical PO→arrival
45–70 days
CIF
Regulatory frame
CIS + LGCs
2026
Why Australia matters in the China solar trade
Australia's solar market is being reshaped by three structural forces: falling Chinese CIF pricing (now $0.108–0.128/W for 620W TOPCon), tightening CIS + LGCs rules, and the migration of financing from utility tenders into distributed C&I. Buyers who understand these dynamics compress landed cost by 8–14% versus generic sourcing.
Supplier shortlist for the Australia market
- LONGi, JinkoSolar, JA Solar, Trina Solar, Canadian Solar — bankable tier-1 modules
- Sungrow, Huawei FusionSolar, GoodWe, Deye — inverters with local service depth
- CATL, BYD, EVE Energy, Pylontech — LFP battery storage
- Arctech, Antaisolar, Xiamen Grace — structures rated for local wind zones
Landed cost & Incoterms for Melbourne
Always benchmark CIF Melbourne rather than FOB Shanghai — freight, insurance and demurrage swings can move total landed cost by 6–9%. For Australia specifically, factor in port dwell times, inland trucking cost per km, and AUD FX volatility if your PO is not USD-denominated.
| Cost line | % of CIF | Notes |
|---|---|---|
| FOB module | 72–78% | Ex Shanghai / Ningbo |
| Ocean freight | 4–7% | 40'HC container |
| Marine insurance | 0.3–0.6% | All-risks |
| Port + destination charges | 3–5% | Melbourne |
| Local taxes & duties | 5–14% | CIS + LGCs |
Compliance checklist
- IEC 61215 ed.3 + IEC 61730 test reports valid in Australia
- Local certifications required under CIS + LGCs
- Warranty documentation domiciled for local enforcement
- Anti-dumping / countervailing duty exposure review
- UN38.3 + MSDS for any lithium battery cargo
Timing & payment
For 2026 delivery slots, place orders 60–75 days before required arrival. Standard payment is 30% TT deposit, 70% against B/L copy — or 100% irrevocable LC at sight for orders above $300k. Push suppliers for a signed price re-open clause tied to polysilicon >$8/kg.
Frequently asked questions
QWhat are the current duties on Chinese solar imports to Australia?
Duties vary by product and origin declaration; under CIS + LGCs the effective landed duty range is typically 0–14% for modules, plus VAT/GST. Always confirm with a licensed customs broker before finalising CIF quotes.
QWhich Chinese port is best for shipments to Melbourne?
Shanghai and Ningbo cover 70% of module volume; Xiamen and Guangzhou are common secondary ports. Ask the supplier for FOB flexibility so you can pick the cheapest weekly sailing.
QHow do we protect against price drops after PO?
Insert a downward-only price adjustment clause tied to a public index (e.g. Solarzoom or InfoLink weekly). Lock CIF freight separately with the forwarder to avoid double-exposure.