Jordan added 95 MW/mo of new solar capacity in the most recent trailing 12 months, and over 90% of the modules landed at Aqaba were manufactured in China. This is the operational sourcing guide our desk uses with buyers active in Jordan — covering supplier vetting, EMRC wheeling compliance, JOD pricing dynamics, container-load economics and delivery timelines from Chinese factory gate to your site.
New capacity (TTM)
95 MW/mo
Jordan
China module share
90%+
@ Aqaba
Typical PO→arrival
45–70 days
CIF
Regulatory frame
EMRC wheeling
2026
Why Jordan matters in the China solar trade
Jordan's solar market is being reshaped by three structural forces: falling Chinese CIF pricing (now $0.108–0.128/W for 620W TOPCon), tightening EMRC wheeling rules, and the migration of financing from utility tenders into distributed C&I. Buyers who understand these dynamics compress landed cost by 8–14% versus generic sourcing.
Supplier shortlist for the Jordan market
- LONGi, JinkoSolar, JA Solar, Trina Solar, Canadian Solar — bankable tier-1 modules
- Sungrow, Huawei FusionSolar, GoodWe, Deye — inverters with local service depth
- CATL, BYD, EVE Energy, Pylontech — LFP battery storage
- Arctech, Antaisolar, Xiamen Grace — structures rated for local wind zones
Landed cost & Incoterms for Aqaba
Always benchmark CIF Aqaba rather than FOB Shanghai — freight, insurance and demurrage swings can move total landed cost by 6–9%. For Jordan specifically, factor in port dwell times, inland trucking cost per km, and JOD FX volatility if your PO is not USD-denominated.
| Cost line | % of CIF | Notes |
|---|---|---|
| FOB module | 72–78% | Ex Shanghai / Ningbo |
| Ocean freight | 4–7% | 40'HC container |
| Marine insurance | 0.3–0.6% | All-risks |
| Port + destination charges | 3–5% | Aqaba |
| Local taxes & duties | 5–14% | EMRC wheeling |
Compliance checklist
- IEC 61215 ed.3 + IEC 61730 test reports valid in Jordan
- Local certifications required under EMRC wheeling
- Warranty documentation domiciled for local enforcement
- Anti-dumping / countervailing duty exposure review
- UN38.3 + MSDS for any lithium battery cargo
Timing & payment
For 2026 delivery slots, place orders 60–75 days before required arrival. Standard payment is 30% TT deposit, 70% against B/L copy — or 100% irrevocable LC at sight for orders above $300k. Push suppliers for a signed price re-open clause tied to polysilicon >$8/kg.
Frequently asked questions
QWhat are the current duties on Chinese solar imports to Jordan?
Duties vary by product and origin declaration; under EMRC wheeling the effective landed duty range is typically 0–14% for modules, plus VAT/GST. Always confirm with a licensed customs broker before finalising CIF quotes.
QWhich Chinese port is best for shipments to Aqaba?
Shanghai and Ningbo cover 70% of module volume; Xiamen and Guangzhou are common secondary ports. Ask the supplier for FOB flexibility so you can pick the cheapest weekly sailing.
QHow do we protect against price drops after PO?
Insert a downward-only price adjustment clause tied to a public index (e.g. Solarzoom or InfoLink weekly). Lock CIF freight separately with the forwarder to avoid double-exposure.
Post your specification on Chinese.Solar and our AI matches you to 3–5 verified tier-1 manufacturers in under 60 seconds — with live CIF pricing, factory audits and export track records.