StorageUtility BESS liquid-cooled Verified Supplier
Tianheng L 5MWh BESS
CGCALB Group·Changzhou, JiangsuCALB's Tianheng L uses L221N113A 314Ah LFP cells in a 20ft container — single-string architecture eliminates inter-cluster circulation losses.
From
$0.115/W
Warranty
10 yr
MOQ
1
Lead time
14 wk
Product highlights
Why buyers specify Tianheng L 5MWh BESS
- Single-string 1500V design
- No inter-cluster losses
- L221 314Ah LFP cells
- Liquid cooling
- 6-side fire suppression
Full datasheet
All electrical, mechanical and compliance specifications
Cell & Chemistry
- Cell Chemistry
- LFP 314Ah (L221N113A)
- Usable Capacity
- 5.014 MWh
- Nominal Voltage
- 1500 V DC
- Depth of Discharge
- 90% usable
- Cycle Life
- 10,000 cycles
- Round-trip Efficiency
- 94% RTE
Electrical
- Max Charge/Discharge Power
- 2,500 kW (1C)
- Voltage Range
- 1,200–1,500 V
- Max Current
- 1,700 A
- Standby Consumption
- <180 W
Thermal & Mechanical
- Cooling
- Liquid
- Dimensions
- 6,058×2,438×2,896 mm
- Weight
- 32,500 kg
- Enclosure / IP Rating
- IP55
- Operating Temperature
- -30 to +55°C
Safety & Compliance
- Certifications
- UN 38.3, IEC 62619, UL 1973, UL 9540A, CE
- BMS
- Distributed BMS
- Fire Suppression
- Aerosol / FK-5-1-12 (NOVEC) optional
- Warranty
- 10-yr
Logistics
- MOQ
- 1
- Lead Time
- 14 weeks
- Shipping
- FOB Shanghai / Ningbo / Shenzhen
- Incoterms
- EXW, FOB, CIF, DAP
Typical applications
Utility BESS
IPP
Renewable integration
Pricing & logistics
EXW China
$0.115/W
Ex-works factory
FOB Shanghai
$0.120/W
Inland + port handling
CIF Europe
$0.133/W
Sea freight + insurance
Indicative pricing for 1+ unit orders, ex-factory Changzhou, Jiangsu. Actual FOB/CIF varies with destination, Incoterms and forex.
Related products
Other storage & catalog matches