Mexico's distributed generation segment installed 1.9 GW in 2025 — almost entirely Chinese modules. This guide covers CFE approval, NOM certification and current CIF Manzanillo pricing.
MX solar DG installs 2025
1.9 GW
under 500 kW segment
TOPCon 620W CIF Manzanillo
$0.128/W
May 2026
Import duty (HS 8541.43)
0%
USMCA + General
NOM-001-SEDE-2012 compliance
Modules and inverters connecting to CFE distribution must comply with NOM-001-SEDE and the CFE G0100-04 specification. Chinese tier-1 SKUs hold current UL 61730 which CFE accepts as equivalent.
Frequently asked questions
QCan I ship via US to Mexico under USMCA?
No — Chinese-origin modules don't qualify for USMCA preferential treatment. Direct CIF Manzanillo or Lázaro Cárdenas is faster and cheaper.
Post your specification on Chinese.Solar and our AI matches you to 3–5 verified tier-1 manufacturers in under 60 seconds — with live CIF pricing, factory audits and export track records.