Philippines installed 1.6 GW of solar in 2025 with strong C&I and residential rooftop growth. Here's how Filipino EPCs and distributors source from China.
PH installs 2025
1.6 GW
TOPCon 585W CIF Manila
$0.124/W
May 2026
Import duty
0%
MFN, ASEAN-China
VAT
12%
on landed value
DOE registration for net-metering
Solar equipment for net-metered systems (up to 100 kW) must be on the Department of Energy's list of eligible products. Chinese tier-1 SKUs are widely listed; verify the specific model number.
Frequently asked questions
QAre LGU permits still needed under net-metering?
Yes — electrical permit from the LGU building office and the DU's net-metering agreement remain required even under the simplified ERC 2023 framework.
Post your specification on Chinese.Solar and our AI matches you to 3–5 verified tier-1 manufacturers in under 60 seconds — with live CIF pricing, factory audits and export track records.