Chinese solar to Brazil
Brazil's distributed generation boom continues to absorb large volumes, with a clear shift toward N-type TOPCon modules.
3.1 GW
+24%
1,110
Santos
Top suppliers exporting to Brazil
Ranked by 2025 shipment volume to Santos
Sourcing guides for Brazil
Category-specific procurement playbooks with pricing, certifications and verified suppliers.
Chinese TOPCon Solar Panels for Brazil — INMETRO Certified
550–625W TOPCon modules CIF Santos with INMETRO 004/2011 certificates. 10.8% BCD, 8-week factory lead time.
Inverters · BrazilChinese Hybrid Inverters for Brazil — INMETRO + ABNT NBR 16149
Single and three-phase hybrid inverters with INMETRO 140/2022 + ABNT NBR 16149 grid-code certification.
Importing Chinese solar into Brazil: FAQ
Procurement, certification, and logistics questions answered.
QWhat is the current import duty on solar modules into Brazil?
Brazil reinstated a 10.8% import tariff on PV modules in March 2024 to support domestic assembly. Inverters carry an 18% tariff. ICMS state taxes apply on top, reclaimable for registered importers.
QDo I need INMETRO certification?
Yes. INMETRO Ordinance 004/2011 (and updates) requires PV modules sold in Brazil to be certified through accredited labs. All tier-1 Chinese brands carry valid INMETRO certificates; verify the model number matches the certificate.
QWhat's the typical sea freight time from Shanghai to Santos?
38–45 days via the Cape of Good Hope. Suez routing adds another 5–8 days due to Red Sea diversions in 2025. Build 12–14 weeks total lead time.